In compliance with the DENR Memorandum Circular 2010-14 dated June 29, 2010 prescribing the outline of the contents of EIA Reports required for ECC applications and the directive to focus the EIA Study to the most critical environmental impacts, project type-specific IEE Checklist Report Form was formulated as a pro-forma EIA Report for Non-Environmentally Critical Projects proposed to be located in Environmentally Critical Areas (ECA).  The formulation of the IEE Checklist Reports is intended to simplify and standardize the requirement for ECC applications for non environmentally critical projects. These IEE Checklist  Report forms likewise provide a checklist of options for disaster and climate change risks management and a menu of adaptation options enhancing the use of the PEISS as a risk-based planning and management tool.

To date the following project type specific IEE Checklist Report Form has been developed:

  • Batching and Crushing Plants
  • Building Projects
  • Cemetery and other Funeral Facilities
  • Fisheries, Aquaculture Projects
  • Food, Food By-products and Beverages Manufacturing
  • Generic – Other types of Projects
  • Irrigation, Flood Control & Minor Dam Projects
  • Livestock & Poultry Projects
  • Non-Food Manufacturing Plants
  • Resorts and other Tourism-Leisure Projects
  • Roads & Bridges
  • Subdivision & Housing Projects
  • Waste Management Projects
  • Water Supply Projects