CATEGORY

APPLIED TO

DOCUMENTS REQUIRED FOR ECC/CNC APPLICATION

Office to process and decide

A: Environmentally Critical Projects A-1: New

Co-located projects

Programmatic EIS*

EMB Central Office

Single Project

EIS

EMB Central Office

A-2: Existing and to be expanded, modified and/or rehabilitated

A-3: Operating without ECC

Co-located projects

Programmatic EPRMP*
(in case programmatic monitoring data are available)*

EMB Central Office

Single Project

EPRMP in case monitoring data are available

EIS if no monitoring data are available

EMB Central Office

 B: Non-Environmentally Critical Projects
B-1:New

 Co-located projects

 Programmatic EIS*

 

EMB Regional Office in the region where the proposed project is located

Single Project

EIS

IEE Checklist

B-2: Existing and to be expanded, modified and/or rehabilitated

 

B-3: Operating without ECC

Single Project

EPRMP

EPRMP Checklist

EMB Regional Office in the region where the proposed project is located

Co-located Project

PEPRMP*

EMB Regional Office in the region where the proposed project is located

 C. Environmental Enhancement or Direct Mitigation

Co-located or Single Projects

Project Description (Parts 1 and II)
(to confirm non-coverage or further classify as either Category A or B)

EMB Regional Office in the region where the proposed project is located

 D. not Covered

Project Description (Part I only)

Project prior to 1982 – Proof of Project Implementation prior to 1982 without expansion/alteration/modification shall also be submitted (if applying for CNC)

EMB Regional Office in the region where the proposed project is located

* Note: (*) – optional, subject to laws, rules and regulations

Description of the different document types:

Programmatic Environmental Impact Statement (PEIS) – a documentation of comprehensive studies on environmental baseline conditions of a contiguous area. It also includes an assessment of the carrying capacity of the area to absorb impacts from co-located projects such as those in industrial estates or economic zones (ecozones).

Environmental Impact Statement (EIS) – the document of studies on the environmental impacts of a project including the discussions on direct and indirect consequences upon human welfare and ecological and environmental integrity. The EIS may vary from project to project but shall contain in every case all relevant information and details about the proposed project or undertaking, including the appropriate mitigating and enhancement measures to address the identified environmental impacts. >> read more…

Initial Environmental Examination (IEE) Checklist Report Form – a short and simplified checklist version of an IEE prescribed by the DENR and required to be filled up by proponents for describing the project’s environmental impact and corresponding mitigation and enhancement measures for non-environmentally critical projects located in an ECA. The DENR prescribes appropriate corresponding IEE Checklists for different projects with minimal and manageable impacts. >> read more…

Programmatic Environmental Performance Report and Management Plan (PEPRMP) – documentation of actual cumulative environmental impacts of co-located projects with proposals for expansions. The PEPRMP should also describe the effectiveness of current environmental mitigation measures and plans for performance improvement.

Environmental Performance Report and Management Plan (EPRMP) – documentation of the actual cumulative environmental impacts and effectiveness of current measures for single projects that are already operating.

Project Description (PD) – a standard documentation of the description necessary to confirm non-coverage of Category D and Category C Projects as well as projects operating prior to 1982. (Annex C of the PEISS Coverage Screening Guidelines for the format/contents)